彩经网首页

<form id="zbfnx"></form>
<noframes id="zbfnx"><form id="zbfnx"></form>

        <form id="zbfnx"></form>
        <form id="zbfnx"><th id="zbfnx"><th id="zbfnx"></th></th></form>

        <address id="zbfnx"></address>
        <form id="zbfnx"><nobr id="zbfnx"><progress id="zbfnx"></progress></nobr></form><noframes id="zbfnx">
        <noframes id="zbfnx">

          <form id="zbfnx"><nobr id="zbfnx"><th id="zbfnx"></th></nobr></form>

              3" Icedrill

              Movie: Ice core drilling at the Jungfraujoch (from the Paul Scherrer Institute)

               

              Svalbart:

               March 2009



              Colle Gniffeti:

               September 2003



               

              Piz Zuppo:

              March 2002

               

              Drilling at Illimani (6400 masl).

              25th Mai - 6th June 1999
               

              Two 3 Inch Ice Core Drills at base camp

              Two baseplates on the way to Illimani

              Two 3 Inch Ice Core Drills at Illimani

              View into the Ice Cap of Illimani

              Drillhead after contact to bedrock
               

               

               

              Drill tests at the Jungfraujoch:

              1998


              Drill with Tent for Protection against sun, wind and snow (tent is a extra option).

              Drill with Shadow Sail



              2" Icedrill

               Drilling at the Aletsch glacier:

              Test of the surface sample drill in temperated ice.
              This drill is basically the 2" drill with a simplyfied drive.

               

              Drilling in the Glaciere de la Molesi:

              Ice core recovered from a ice cave in the
              swiss jura.

              Poor core quality due to a lot of stones in the ice.

               

              Test at the Jungfraujoch:


              Complete drill with transportation protection

              Put the drill together

              Check the clutch

              Check the cutting ring

              Drilling

              Break the core

              Open the clutch

              Remove the icecore

              Seperate the chips barrel

              Remove the drillchips


              Drilltent:

               
              Erection at Lomosonovfonna (Svalbart)
              the 03/22/2009

              Ambient temperature below -20°C

              Start time 16.10
              End time 17.20

              03/22/2009 16.17

              16.18

              16.26

              16.27

              16.50

              17.00

              17.01

               

              17.25

               

               

               

                

               

               

               

               

               At the Jungfraujoch:    

               

               

               

               

               

               

               

               

               

               

               

              Home
               

              d.stampfli
              Copyright © 2010 mobile.qgool.com.cn AG.
              Date: 07/20/10

              <form id="zbfnx"></form>
              <noframes id="zbfnx"><form id="zbfnx"></form>

                    <form id="zbfnx"></form>
                    <form id="zbfnx"><th id="zbfnx"><th id="zbfnx"></th></th></form>

                    <address id="zbfnx"></address>
                    <form id="zbfnx"><nobr id="zbfnx"><progress id="zbfnx"></progress></nobr></form><noframes id="zbfnx">
                    <noframes id="zbfnx">

                      <form id="zbfnx"><nobr id="zbfnx"><th id="zbfnx"></th></nobr></form>

                          the weather

                          mailbox

                          Premier League

                          search for

                          constellation

                          news

                          culture

                          mailbox

                          reading